Witney ElectricianWJ Lyne Electrical 07700 9001237am – 9pm, 7 days

EICRs and safety checks

EICR electrical safety checks

An Electrical Installation Condition Report tells you the actual state of the wiring, with anything dangerous coded so you know what must be done and what can wait.

Part P registeredFully insuredPrice agreed before work starts

Rented homes in England need one at least every five years, and at the start of a new tenancy if the existing report has run out. Agents ask for them, buyers' solicitors ask for them, and homeowners book them when a house has not been looked at in a decade.

The inspection is part visual and part dead and live testing: continuity, insulation resistance, polarity, earth fault loop impedance and RCD operation, on a sample of circuits or all of them depending on the property. Observations are coded C1 (danger present), C2 (potentially dangerous), C3 (improvement recommended) or FI (further investigation). Only C1 and C2 make a report unsatisfactory — a page of C3s does not.


Questions

About this work

How long does an EICR take?

Two to three hours for a flat or small house, longer for a large or heavily altered property. The power goes off in stages rather than all day.

What if it comes back unsatisfactory?

You get a written quote for the C1 and C2 items, with each one priced separately so you can see what you are paying for. Fix them and the report is re-issued.

Do I have to act on C3 items?

No. C3 means an improvement is recommended, not that anything is unsafe. A report with only C3 observations is satisfactory.


Where

EICRs and safety checks across the patch

Same work, wherever you are on the list. Full areas covered.


Want this quoting?

Ring with the postcode and I will tell you what it involves.

Call now Photo