Witney ElectricianWJ Lyne Electrical 07700 9001237am – 9pm, 7 days

Fuse board upgrades

Fuse board and consumer unit replacement

If one fault takes out the whole house, or the board still has rewirable fuses, it is doing a job that modern boards do far better.

Part P registeredFully insuredPrice agreed before work starts

An older board usually has one RCD covering everything, so a failing freezer in the garage puts the lights out upstairs. A modern board gives every circuit its own RCBO: the faulty circuit drops out and the rest of the house carries on. For anyone working from home or with a freezer full of food, that alone is worth the job.

A replacement is a day's work in most houses. The supply is isolated, every circuit is tested before and after, earthing and bonding are brought up to current standards, and you get an Electrical Installation Certificate with the test results on it. The work is notifiable, so it is registered with the scheme and building control is notified.


Questions

About this work

How long does it take?

A straightforward swap is a single day with the power off for most of it. If the earthing or bonding needs upgrading, or circuits fail testing, it can run longer — that gets discussed before anything is disconnected.

Do I get a certificate?

Yes — an Electrical Installation Certificate with the full test schedule, plus notification to building control through my Part P scheme.


Where

Fuse board upgrades across the patch

Same work, wherever you are on the list. Full areas covered.


Want this quoting?

Ring with the postcode and I will tell you what it involves.

Call now Photo